← Directory
ST
🇨🇳 ChinaKCEM VerifiedLocalization: High

Sinotech Energy Solutions

Ultra-deep drilling rigs and automated wellhead systems for harsh operating environments.

Request introduction

Company overview

Sinotech Energy Solutions is a Tier-1 provider of ultra-deep drilling rigs, automated wellhead maintenance, and digital twin diagnostics. Their equipment is deployed across the Tarim Basin and is well-suited for Caspian and Mangystau geological profiles. KCEM Center has completed full site inspection of their primary manufacturing facility in Xi'an and confirmed credit standing through China Cheng Xin International.

  • Ultra-deep drilling to 8,000m verified
  • ISO 9001 / API Q1 certified manufacturer
  • Operating reference projects in 6 countries
  • Patented downhole telemetry system

Main technologies & products

ZJ70DBS Ultra-Deep Drilling Rig

8,000m capable land rig with automated pipe handling and AC drive system.

WellGuard Automated Maintenance

Robotic wellhead intervention system reducing manual exposure by 80%.

DigitalTwin Drilling Suite

Real-time torque, drag and ROP optimization with predictive failure alerts.

Case studies & applications

Tarim Basin Deep Gas Project

Xinjiang, China

Drilled 12 ultra-deep wells averaging 7,400m TVD, reducing NPT by 22% versus offset wells.

Caspian Offshore Service Contract

Turkmenistan sector

5-year automated maintenance contract on 18 wellheads with zero recordable incidents.

Photo gallery

ZJ70DBS rig at Xi'an factory
ZJ70DBS rig at Xi'an factory
Tarim Basin drilling site
Tarim Basin drilling site
Automation control room
Automation control room

Documents & materials

Corporate Brochure 2024
Brochure
Tarim Basin Case Study
Case Study
Technical Specifications
PDF

Potential applications in Kazakhstan

  • Pre-Caspian basin deep gas exploration (Atyrau, Mangystau)
  • Workover and maintenance services for KazMunayGas mature fields
  • Joint EPC bids on Tengiz and Karachaganak service tenders

What this company is looking for

Distributor / Local PartnerEPC ProjectsPilot Project

Localization willingness · High

Open to assembling rig modules in Kazakhstan and training local service crews within 18 months.

Inquiry form

KCEM Center will facilitate a verified introduction.